Unit commitment by dynamic programming method

unit commitment (plant scheduling) based on the forward DP method

Ahora está siguiendo esta publicación

Unit commitment based on an advanced forward DP technique. The user can choose to keep track of more than one predecessor (or even all) thus overcoming the drawback of DP method that it cannot "see" the optimal solution in some cases.
Program constraints are min. and max. power output of generators, their min. up and down times, ramp rates, required reserve. Start-up costs can be constant (cold), hot/cold or exponential. Production cost function can be either linear or quadratic. The results can be printed in summarized or in detailed form. Program works in time resolution of 1 hour.

Citar como

Vladimir Stanojevic (2026). Unit commitment by dynamic programming method (https://la.mathworks.com/matlabcentral/fileexchange/32073-unit-commitment-by-dynamic-programming-method), MATLAB Central File Exchange. Recuperado .

Categorías

Más información sobre Quadratic Programming and Cone Programming en Help Center y MATLAB Answers.

Información general

Compatibilidad con la versión de MATLAB

  • Compatible con cualquier versión

Compatibilidad con las plataformas

  • Windows
  • macOS
  • Linux
Versión Publicado Notas de la versión Action
1.0.0.0