Limit the power generation at the slack bus.
2 visualizaciones (últimos 30 días)
Mostrar comentarios más antiguos
Good day,
How can limit the power generation at the slack bus so that it does not increase after running the simulation?
please help
0 comentarios
Respuestas (1)
arushi
el 21 de Dic. de 2023
Hi Adao,
I understand that you want to limit the power generation at the slack bus to prevent it from increasing during the simulation. Since active power delivered by Generator Bus and consumed by Load Bus differ, this means that a power loss equal to the difference between Generator Bus P and Load Bus P is occurring. Since active power delivered by Generator Bus and consumed by Load Bus differ, this means that a power loss equal to the difference between Generator Bus P and Load Bus P is occurring. Therefore, to supply power loss, an extra Generator bus is considered for which bus magnitude and voltage is specified and active power and reactive power are to be calculated. This active power of slack bus is the equivalent power loss occurring in different system. To limit the power at the slack bus you can try setting constraints on the Generator power outputs as well as the Load bus generator power outputs.
Hope this helps.
Thank you
Ver también
Categorías
Más información sobre Get Started with Specialized Power Systems en Help Center y File Exchange.
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!