Power load cycle using GUIDE MATLAB GUI
The daily load curve of a utility is a composite of demands made by various classes of users.The greatest value of load during a 24-hr period called the peak or the maximum demand.Load factor is a ratio of average load over a designated period of time to the peak load ocuuring in that time.[Haddi Saddat Power System analysis P8].
We used barcycle function to plot the load cycles. Brcycle.m function is also included with the other files
Citar como
Tamir Suliman (2024). Power load cycle using GUIDE MATLAB GUI (https://www.mathworks.com/matlabcentral/fileexchange/39624-power-load-cycle-using-guide-matlab-gui), MATLAB Central File Exchange. Recuperado .
Compatibilidad con la versión de MATLAB
Compatibilidad con las plataformas
Windows macOS LinuxCategorías
Etiquetas
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!Descubra Live Editor
Cree scripts con código, salida y texto formateado en un documento ejecutable.
loadcycle/
Versión | Publicado | Notas de la versión | |
---|---|---|---|
1.0.0.0 |