Different start and stop time within a system in Simulink

2 visualizaciones (últimos 30 días)
Is it possible to make some sort of subsystem that has different start and stop time of the simulation? I would like to built a simulation with Start time 0 and Stop time at 200, and inside this main model, I want to make a subsystem that would have a Start time at 20 and Stop time at 50.
Is there any way i can achieve it? Cheers

Respuesta aceptada

Azzi Abdelmalek
Azzi Abdelmalek el 21 de Nov. de 2013

Más respuestas (0)

Categorías

Más información sobre Simulink en Help Center y File Exchange.

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by