Info

La pregunta está cerrada. Vuélvala a abrir para editarla o responderla.

Controlling the NextHitValue in a large simulink file

1 visualización (últimos 30 días)
Anfänger
Anfänger el 14 de Abr. de 2014
Cerrada: MATLAB Answer Bot el 20 de Ag. de 2021
Is there a way to control the simulation step in simulink? I am having a large file, where each block is user defined Matlab Level2 S-function. Within each block, I have implemented a necessary condition for stability, which enables me to get the maximum time step for which the current block will be stable. This means, that for the complet file, I have to take the smallest time step from all blocks and set iteratively, the NextHitValue of the individual blocks to this value. How can I do that without using global variable?

Respuestas (0)

Productos

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by