Info

La pregunta está cerrada. Vuélvala a abrir para editarla o responderla.

Controlling the NextHitValue in a large simulink file

1 visualización (últimos 30 días)
Anfänger
Anfänger el 14 de Abr. de 2014
Cerrada: MATLAB Answer Bot el 20 de Ag. de 2021
Is there a way to control the simulation step in simulink? I am having a large file, where each block is user defined Matlab Level2 S-function. Within each block, I have implemented a necessary condition for stability, which enables me to get the maximum time step for which the current block will be stable. This means, that for the complet file, I have to take the smallest time step from all blocks and set iteratively, the NextHitValue of the individual blocks to this value. How can I do that without using global variable?

Respuestas (0)

La pregunta está cerrada.

Productos

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by