Info
La pregunta está cerrada. Vuélvala a abrir para editarla o responderla.
Controlling the NextHitValue in a large simulink file
1 visualización (últimos 30 días)
Mostrar comentarios más antiguos
Is there a way to control the simulation step in simulink? I am having a large file, where each block is user defined Matlab Level2 S-function. Within each block, I have implemented a necessary condition for stability, which enables me to get the maximum time step for which the current block will be stable. This means, that for the complet file, I have to take the smallest time step from all blocks and set iteratively, the NextHitValue of the individual blocks to this value. How can I do that without using global variable?
0 comentarios
Respuestas (0)
La pregunta está cerrada.
Ver también
Productos
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!