Why using an external clock with a NI-DAQ (USB 6211) data acquisition board is too slow?

1 visualización (últimos 30 días)
Hi, I have this code of MATLAB for obtaining the number of counts from an Avalanche Photodiode detector with the NI-DAQ model USB 6211 I am adding an external clock to obtain the counts but it takes longer per measure I do not understand why if I am putting adquisition time of 0.01 seconds. Here I leave the code I have for now:
dataFocus = [];
acq_time=0.01;
N = 1
while true
tic
dataIn= read(dq,seconds(acq_time));
timing=toc()
n0 = max(dataIn.Dev1_ctr0);
dataFocus(N) = n0/acq_time;
if N<= 150
figure(1);
plot(dataFocus, 'Linewidth',1.5);
else
plot(dataFocus(end-150:end), 'Linewidth',1.5);
end
drawnow
N=N+1;
end
I appreciate your help,
Kind regards
  5 comentarios
Adriana
Adriana el 29 de Jun. de 2022
Editada: Adriana el 7 de Jul. de 2022
Thank you very much for your help, I changed the code with the start and it's working now with the proper time. However now it has a delay. It can be observed when starting and making changes.
dataFocus = [];
h = animatedline();
acq_time=0.01;
N = 1;
start(dq,"Continuous")
while true
tic
dataIn= read(dq,seconds(acq_time));
timing=toc()
n0 = max(dataIn.Dev1_ctr0)-min(dataIn.Dev1_ctr0);
dataFocus = n0/acq_time;
addpoints(h,N,dataFocus);
drawnow
N=N+1;
end

Iniciar sesión para comentar.

Respuestas (1)

Vinayak
Vinayak el 9 de Feb. de 2024
Hi Adriana,
From the modified code you shared, the delay in real-time plotting may arise due to factors such as inefficient timing calculations and plotting operations. This problem may be address with:
  • Increased Acquisition Time: You may modify the acquisition time to consider additional time for completion like:
% Additional time for completion
delay_time = 0.005; % Modify as per your setup
dataIn = read(dq, seconds(acq_time + delay_time));
The code now reads data with a slightly longer time to ensure completion of the acquisition operation, accounting for potential variations in the device's response time.
  • Callbacks in drawnow: Real-time plotting operations can be affected by the timing of data acquisition, particularly when dealing with rapidly changing data streams. Consider optimizing the plotting process to improve performance. You may also want to refer to the documentation for `drawnow` to explore options for processing callbacks efficiently.By implementing these suggestions, you should be able to mitigate the delay issue during data acquisition and achieve more accurate counts from the APD detector. Remember to adjust the additional delay time based on your system's characteristics to optimize performance.

Categorías

Más información sobre Startup and Shutdown en Help Center y File Exchange.

Productos

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by