Can power factor (PF) be scheduled in during a 24hour period
Mostrar comentarios más antiguos
Good day,
The input to a controlled current source is fed by the attached power factor (PF) block and 1-D look-up data representing a load or irradiance. The reactive power produced by adjusting the PF setpoint is proportional to the active power generated over a 24hour period.
Is there a method to schedule the PF output by switching the signal on/off automatically during a pre-programmed time?
3 comentarios
Walter Roberson
el 4 de Sept. de 2022
Suppose you had a hot sunny day, you are getting good irradiance. But with it being that hot, there is a chance of evening thunderstorms for anywhere from 2 minutes to 5 hours. Can you predict the evening irradiance with enough certainty to be able to change your signal during the daytime so that the end result of the 24 hour period has the desired characteristics ?
Bill Murray
el 4 de Sept. de 2022
Walter Roberson
el 4 de Sept. de 2022
What are the modeled consequences of turning it off?
What is the mathematics of turning it off? If, for example, you left it on for 4.5 hours, and turned it off for 0.5 hours, then what would be the mathematical effect?
How quickly can it be changed?
"The irradiance is based on historical data, which is from 06h00 to 18h30"
So... useless for real-world use, making this an academic exercise. If, at any point in the day, the decision to turn the signal on or off depends upon using the historical data as an oracle to predict how the rest of the day will definitely be, then this is all a "would'a-could'a" game.
It would be fair to use the historical data from before the modeled date as statistical, to model probabilities of what the rest of the day might be like -- but you risk failing to meet the target if the actual data does not match predictions.
Respuestas (1)
Dallas Perkins
el 28 de Sept. de 2022
0 votos
Hi Bill,
You could use a switch on your output line to change the value between what you have pictured and zero (or some other value). To switch the output at set times you could use something like a pulse generator or repeating sequence stair to specify those times.
Best,
Dallas
1 comentario
Bill Murray
el 2 de Oct. de 2022
Categorías
Más información sobre Electrical Systems en Centro de ayuda y File Exchange.
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!