Issue with 5 MW Grid Model in Simscape — Power Not Increasing Beyond Certain Load

3 visualizaciones (últimos 30 días)
I am currently working on modeling an electrical grid using MATLAB/Simulink Simscape. The goal is to create a grid capable of handling a 5 MW load.
The grid side of the model is configured as follows:
✅ a 3-phase grid (33 kV, 50 Hz, X/R = 10)
✅ followed by a transformer (33 kV → 690 V, 50 Hz)
✅ and an LCL filter
However, I’m facing an issue: when I increase the load beyond a certain level, the power delivered does not increase as expected — it seems to be limited somewhere in the model. I suspect this might be due to constraints or incorrect parameters in the source, transformer, or LCL filter, but I haven’t been able to identify the exact cause yet.
If you have experience with Simscape power systems modeling, transformer and filter configuration, or have encountered similar challenges, I would be grateful for your insights, suggestions, or recommended resources.

Respuestas (1)

Satwik
Satwik el 22 de Jul. de 2025
Movida: Sabin el 6 de Ag. de 2025
Feel free to share your model file so that the community has a better chance to investigate the issue and provide useful insights.
Meanwhile, here are some resources which might prove useful. These are examples that demonstrate the modelling of electrical and power grids:
I hope this helps!
  1 comentario
divyansh
divyansh el 22 de Jul. de 2025
Movida: Sabin el 6 de Ag. de 2025
Hi, thanks for the suggestions and links! I was able to get it running by adding an LCL filter to the system. It helped stabilize the model and resolved the issue.

Iniciar sesión para comentar.

Categorías

Más información sobre Applications en Help Center y File Exchange.

Etiquetas

Productos


Versión

R2025a

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by