How to bring a plot to the front or back among multiple plots

754 visualizaciones (últimos 30 días)
Liqing
Liqing el 24 de Feb. de 2012
Comentada: Yogishree Arabinda el 25 de Abr. de 2024 a las 15:48
I have some interpolated ocean data that goes to land. I am thinking to first plot the interpolated values using 'scatter', and then plot the map using 'fill'. But the problem is that, it does not matter which one I plot first, the scatter plot is always on top. My question is how do I bring the scatter plot to back (behind the fill plot)?
Thank you,

Respuesta aceptada

Walter Roberson
Walter Roberson el 24 de Feb. de 2012
Are you using transparency? Or does
get(gca, 'Renderer')
return OpenGL ?
If so then note that OpenGL does not pay attention to the child order: it works in (projected) Z order. It also has rules about what happens if there is a line and a surface in the same plane: the order is determined by the graphic type. I never bothered to remember which order OpenGL defines in this case, as I have encountered graphics driver that get the order exactly backwards.
In the case of OpenGL, you need to make sure that the item that you want to be on "top" has a higher (projected) Z coordinate, closer to the front from the perspective of the viewer. That can involve using scatter3() instead of scatter() and specifying a constant Z coordinate above or below the implied Z=0 of other objects.
  4 comentarios
Walter Roberson
Walter Roberson el 31 de Mayo de 2013
image() objects are 2D objects, not 3D objects whose Z happens to be 0. The difference between 2D and 3D with a constant Z can be seen when you tilt the perspective: when not seen from the top, the 2D object will vanish except for its edge, whereas the 3D object with constant Z will do the expected projection to become an angled surface.
pcolor is equivalent to surf() followed by view([0 90])
If you want to be able to tilt an image then you need to texture map it onto either a surface() object or a patch() object. Those steps are also required if you want to give an image a specific z coordinate so as to get layering as appropriate for your situation.
Walter Roberson
Walter Roberson el 15 de Jul. de 2021
Editada: Walter Roberson el 15 de Jul. de 2021
Note: as of R2014b, the available options changed. See https://blogs.mathworks.com/graphics/2014/11/04/sortmethod/

Iniciar sesión para comentar.

Más respuestas (4)

the cyclist
the cyclist el 24 de Feb. de 2012
The "Children" property of the axis is a list of the handles of the objects on the plot. In general, the order of that list determines the layering.
Here is a simple example where I manipulate the order of that list:
[EDITED in response to comment.]
figure
scatter(rand(150,1),rand(150,1))
hold on
fill([0.2 0.5 0.5 0.2],[0.2 0.2 0.5 0.5],'r')
hg = line([0 0.6],[0.6 0]);
set(hg,'LineWidth',12,'Color','g')
h = get(gca,'Children');
set(gca,'Children',[h(3) h(2) h(1)])
  5 comentarios
Xiaohui Zhang
Xiaohui Zhang el 12 de Jul. de 2022
This works perfect! Thanks!

Iniciar sesión para comentar.


Aniruddh Murali
Aniruddh Murali el 7 de Dic. de 2017
I have an image and two points. Each point should have its trail shown and the image should be changed each time. How do I do that?
  2 comentarios
the cyclist
the cyclist el 7 de Dic. de 2017
I suggest you open a new question for this, rather than appending an "answer" onto a four-year-old question that is barely related to what you want to do.
When you open your new question, please add significantly more detail about what you want. What you have written does not give sufficient information for us to help you.
Austin Coleman
Austin Coleman el 1 de Abr. de 2021
lol this guy was irritated. If you took the time to respond to a "4 year old question" just answer the question hahaha

Iniciar sesión para comentar.


Thelanorth
Thelanorth el 26 de Feb. de 2019
What worked for me, I wanted to draw some lines etc. over a data, was to just use plot3([x1 x2],[y1 y2],[z1 z2]) ipv plot([x1 x2],[y1 y2]).
This means that just adding a z coordinate higher than you data might work.

D
D el 12 de Feb. de 2023
Editada: D el 12 de Feb. de 2023
A quick way to move the top child all the way to the bottom would be to use circshift:
hax = gca;
hax.Children = circshift(hax.Children, -1);
  2 comentarios
Walter Roberson
Walter Roberson el 12 de Feb. de 2023
When you are dealing with 3D graphics, the child order can influence what is drawn, but there are other important factors as well; https://blogs.mathworks.com/graphics/2014/11/04/sortmethod/
Yogishree Arabinda
Yogishree Arabinda el 25 de Abr. de 2024 a las 15:48
Thanks a lot it worked for me. Just needed to change from '-1' to '-2' as I had to bring the line below two other curves.

Iniciar sesión para comentar.

Categorías

Más información sobre Graphics Performance en Help Center y File Exchange.

Etiquetas

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by