Using for loop for plotting from a timetable?

2 visualizaciones (últimos 30 días)
Hydro
Hydro el 23 de Dic. de 2017
Comentada: Peter Perkins el 5 de En. de 2018
Attached is a sample of my data that I would like to plot. I would like to use for loop to automate plotting from the timetable directly. Below is my code, however, it seems there is some problem. any thoughts would be appreciated. I would also like to get a handle to enhance the plot further.
for ii=1:2
plot(TT2.Date,TT2.(:,ii))
end

Respuesta aceptada

Walter Roberson
Walter Roberson el 23 de Dic. de 2017
Editada: Walter Roberson el 23 de Dic. de 2017
plot(TT2.Date, TT2{:,ii})
... and remember the "hold on"

Más respuestas (1)

Peter Perkins
Peter Perkins el 28 de Dic. de 2017
I imagine that
plot(TT2.Date,TT2{:,1:2})
would also work. And if there's only two variables in your timetable, that's equivalent to
plot(TT2.Date,TT2.Variables)
where "Variables" is the default name to use, but it's whatever TT2.Properties.DimensionNames{2} is set to.
  2 comentarios
Hydro
Hydro el 28 de Dic. de 2017
Thanks Peter. There are a number of variables (~10). It would be very inconvenient to plot them one by one, that's why I want to use the loop to automate the plotting.
Peter Perkins
Peter Perkins el 5 de En. de 2018
You only think you want a loop. This
plot(TT2.Date,TT2{:,1:2})
plots them both at once, without a loop.

Iniciar sesión para comentar.

Categorías

Más información sobre Logical en Help Center y File Exchange.

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by