Hi,
I'm trying to optimise the energy mixture in a power system. I've the following problem:
____________________________________
prob = optimproblem('Objective',(Inv_w/LT_w*Pcap_w+Fix_w*(Pcap_w+18)+sum(Var_w*(Pcap_w+18)*Ppu_w)+ Inv_s/LT_s*Pcap_s+Fix_s*Pcap_s+sum(Var_s*Pcap_s*Ppu_s)+Inv_t/LT_t*Pcap_t+Fix_t*Pcap_t+sum(Var_t*Pcap_t*Ppu_t)),'ObjectiveSense','min');
____________________________________
The production has to meet the demand at any hour throughout the year. I know I can set one constraint for each hour manually, but I doubt this is the most efficient use of my time:
____________________________________
prob.Constraints.c1 = (Pcap_w+Kw)*Ppu_w(1)+Pcap_s*Ppu_s(1)+Pcap_t*Ppu_t(1) >= demand(1);
prob.Constraints.c2 = (Pcap_w+Kw)*Ppu_w(2)+Pcap_s*Ppu_s(2)+Pcap_t*Ppu_t(2) >= demand(2);
.
.
.
prob.Constraints.c8760 = (Pcap_w+Kw)*Ppu_w(8760)+Pcap_s*Ppu_s(8760)+Pcap_t*Ppu_t(8760) >= demand(8760);
____________________________________
Is there any way I can set the constraints for each hour throughout a loop or something?
Thanks on advance!

 Respuesta aceptada

Alan Weiss
Alan Weiss el 21 de En. de 2019

0 votos

Did you try
constr = (Pcap_w+Kw)*Ppu_w + Pcap_s*Ppu_s + Pcap_t*Ppu_t >= demand;
prob.Constraints.constr = constr;
Alan Weiss
MATLAB mathematical toolbox documentation

Más respuestas (0)

Productos

Versión

R2018b

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!

Translated by