LTE MIMO Beamforming on Ray Tracing Channels
Model transmission of an LTE signal over a ray tracing channel using LTE and Phased Array System Toolbox™. The singular value decomposition (SVD) of the channel matrix provides the beamforming matrix for the transmitter and the receiver, and you can explore the relationship between angles or departure, angles of arrival, and radiation patterns for the transmit and receive antennas. The performance gain from beamforming is simulated for a various number of antennas, a number of scatterers in the channel, and carrier frequencies up to 60GHz, based on EVM measurement of the receive signal.
Recorded: 20 Jan 2017
Featured Product
LTE Toolbox
Seleccione un país/idioma
Seleccione un país/idioma para obtener contenido traducido, si está disponible, y ver eventos y ofertas de productos y servicios locales. Según su ubicación geográfica, recomendamos que seleccione: .
También puede seleccionar uno de estos países/idiomas:
Cómo obtener el mejor rendimiento
Seleccione China (en idioma chino o inglés) para obtener el mejor rendimiento. Los sitios web de otros países no están optimizados para ser accedidos desde su ubicación geográfica.
América
- América Latina (Español)
- Canada (English)
- United States (English)
Europa
- Belgium (English)
- Denmark (English)
- Deutschland (Deutsch)
- España (Español)
- Finland (English)
- France (Français)
- Ireland (English)
- Italia (Italiano)
- Luxembourg (English)
- Netherlands (English)
- Norway (English)
- Österreich (Deutsch)
- Portugal (English)
- Sweden (English)
- Switzerland
- United Kingdom (English)
Asia-Pacífico
- Australia (English)
- India (English)
- New Zealand (English)
- 中国
- 日本Japanese (日本語)
- 한국Korean (한국어)